ORGANIZATION OF PLANNING AND MANAGEMENT OF SHIP REPAIRS BASED ON NETWORK SCHEDULES. DOMESTIC EXPERIENCE
Abstract and keywords
Abstract (English):
In work the system of network planning and management, is investigated by the enterprises and to exercise planning, the control and expeditious regulation of production allowing to improve effectively work of management personnel. The network schedule allows to carry out the multiple analysis of various decisions on change of the technological sequence of works, to distribution of resources, etc. for the purpose of improvement of the initial plan. In a representative example methods of reduction of time of the critical way used for optimization of the network schedule are visually presented.

Keywords:
ship-repair enterprises, network schedule, valid operation, fictitious operation, event, critical way, repair of the rotary mechanism of the ship crane, system of planning and management
Text
Publication text (PDF): Read Download
References

1. Deruzhinskiy V. E., Berezovskiy F. M., Deruzhinskiy G. V. Ekonomika i organizaciya sudoremontnogo proizvodstva: uchebnoe posobie / pod red. V. E. Deruzhinskogo. - Novorossiysk: E1GMA, 2004.

2. Kohtev A. A. Osnovy standartizacii. -M.: «Vysshaya shkola», 197E

3. Liberman E. E., Zvyagincev Yu. E., Zolotarev A. N. i dr. Organizaciya i planirovanie proizvodstva na mashinostroitel'nyh predpriyatiyah,- M.: «Mashinostroenie», 1967.

4. Ben'kovskiy, D. D. Organizaciya i planirovanie proizvodstva na sudoremontnyh predpriyatiyah. D.D. Ben'kovskiy, L.E. Budorackiy, E.A. Oganezov, C.L. Soyfer, D.P. Terk - Izd-e 2-e, pererab. i dop. - M., «Transport», 1976.

5. Deruzhinskiy V. E., Ablyazov E. K. Modeli konkurentosposobnosti predpriyatiya. Zarubezhnyy opyt.// Vestnik Eosudarstvennogo Morskogo universiteta imeni admirala F. F. Ushakova. №3 (32).


Login or Create
* Forgot password?